New Building Permit
ZP02 Main Service Procedural
ZP02 Main Service Procedural
Processing Time:4 Working Days
Linked Services: Yes
Service Enabled Channels
Happiness Center,Website
- Service Information
- Additional Information
- Service Provider
Service Description
This application allows to obtain a building permit for the proposed project or wall (wall, metal wall, retaining wall) on an empty land according to the plans submitted to the Buildings Administration (architectural and construction plans).
Procedures:
- The application is opened through the Consultancy Office on the Official Website of Ras Al Khaimah Government Portal www.rak.ae with attaching the initial documents or through Customers Happiness Center in some cases (Municipal plans / Agricultural plots / Public Housing).
- Initial fees and insurance are paid
- The plans are uploaded through Consulting Office
- Application submission method is reviewed by Draftsmen
- The request is transferred to the Architect, Structural Engineer and Communications Engineer to audit the request in parallel
- A notice is sent to the Consulting Office approving Architectural, Constructional and communication plans for the purpose of completing the attachment of the final documents to approve the license
- The application is referred to the Chief Engineer for final approval
- Final fees, insurance are paid and final documents are submitted
- Both the Supervising Consultant and the Contractor are appointed through the Consulting Office
- Permit is electronically issued
Service Conditions
·In case of building a wall on empty land, the land must be owned or a constructed villa under Sheikh Zayed Housing Program. ·The license shall not be issued until after the marking has been fixed and the level determined by Planning and Survey Administration.
Required Documents
- Valid Sitemap (Grant Plots) + Property Ownership (if any)
- NOC (FEWA, Etisalat, Public Services Department (Wastewater) & RAK Gas
- Owner’s ID copy 5. If the plot is under the Sheikh Zayed Housing Program, the following must be attached:
- Sheikh Zayed Housing Program Valid Letter.
- Mortgage Contract (if the grant is "loan")
- In case the financial assistance (grant) and construction on an owned voucher.
- Attach a statement from the Planning and Survey Administration stating not to grant the owner a grant plot under the program.
- Planning and Survey Administration’s planning requirements (commercial and residential plots)
- Color interface for non-residential plots
- A letter from the concerned party in case the project belongs to the federal and local entities and includes:
- a. Approval of Ministry of Education for projects related to schools, universities or institutes
- b. Approval of Ministry of Health & Prevention for hospitals & clinics
- c. Approval of Ras Al Khaimah Tourism Development Authority for Hotels and Resorts
- d. Approval of the General Authority for Islamic Affairs and Endowments for mosques projects and their supplements
- e. Approval of Environmental Protection Authority in case of approving the establishment of a factory in agricultural lands or establishing a project near a designated area as a natural reserve f. Approval of Ministry of Infrastructure Development
- Soil Testing (Non Residential Projects)
- Arithmetic Detection (If required)
Service Fees
Table Attached
Main Outcome
Permit is electronically issued
Service Channels and Timings
Customer Happiness Centers both in Main Building & Wadi Isfini Website: https://rak.ae
Application Forms
Application Form
Sub Services
NA
Service Link
- NOC from FEWA, & Public Services Department (Wastewater)
- Sheikh Zayed Housing Program if the permit under the Program
- Completion Certificate to connect services or ownership
- Building waste disposal permit from Public Services Department
Notes
NA
Extra Service
- Parking Areas for Women and People of Determination
- Dedicated places for women
- Special Counter for Women and People of Determination
- Hospitality
- Provision of Hot beverages and Water
Partners
- NOC from FEWA, & Public Services Department (Wastewater)
- Sheikh Zayed Housing Program if the permit under the Program
- Completion Certificate to connect services or ownership
- Building waste disposal permit from Public Services Department
Service Limitation
NA
Attachments
Attachment is missingUseful Links
Report an Issue
- RAK Municipality
- 800661
- +971 72330899
- info@mun.rak.ae
Sun 29 March 2020
Sun
March